Features of the contractor's reporting module

During the service life of the completed project, this system allows rapid access to all construction data avoiding time consuming and costly investigations.

Follow-up of contractor's requirements
allows to establish daily-, workgroup-, equipment- and daily extra-work-reports, delivery notes etc., their integration and analysis.
enables the contractors field manager and the resident project representative to have a quick overview and control of the contractor's performance.
easy cost control thanks to the grouping of the contractual items
can take into consideration also variable factors such as geology, shut downs, etc.
calculates automatically key-figures (time and costs per linear meter), cost overviews, continuing trends and can show these figures graphically.

Download


module pictures coming soon...
top of page